Skip to content
Allsite

EWRB, waste audits, bill watch, and clean data.

For the people who run buildings — filings done, bills watched, records in one place.

Ontario compliance noticeBuildings of 50,000+ sq ft file EWRB (O. Reg. 506/18). Designated sites need a yearly waste audit (O. Reg. 102/94).

Check a building for an audit or a filing.

Fill in the building, then press See the result.

Gross floor area

The services

Most teams pair EWRB with the monthly bill watch.

An office building, a water drop, and a lightning bolt.

Service 1

EWRB reporting

50,000+ sq ft filing due July 1. From 10,000 sq ft, start tracking early.

Open EWRB reporting

Service 3

Analytics Engine

Monthly utility watch from ~10,000 sq ft — cut bills, get filing-ready.

Open Analytics Engine

How it works

  1. 1

    Tell us the operation

    A building, a plant, or the files.

  2. 2

    We do the work

    We sort the waste, prepare the filing, watch the bills, or clean the data.

  3. 3

    You get the result

    The filing, the monthly note, or one current set.

Frequently Asked Pricing & Threshold Questions

How much do you charge for EWRB filing, a Waste Audit, the Analytics Engine, or data management?

Because commercial properties vary drastically in physical scale, meter complexity, and stream volume, we do not use generic, one-size-fits-all pricing. Our fees are structured transparently based on explicit variables:

  • EWRB Reporting: $350 per building per year for standard filing. Filing plus verification for 100,000+ sq. ft. buildings starts from about $500 on the service page; final total confirmed before you book.
  • Waste Audits: Priced as a flat project fee determined by building type (e.g., a multi-residential building vs. a multi-story commercial tower) and the number of active waste streams (garbage, recycling, cardboard, organics).
  • Analytics Engine: Quoted as a monthly retainer from the number of properties, utility accounts, and meters — not a published dashboard rate on the EWRB page.
  • Data management: Quoted from the records you want held in one place. There is no published rate.

We review your property thresholds and utility structures upfront to deliver a fixed, transparent quote within 1 business day—with zero hidden administration fees.

What are the penalties for missing Ontario compliance deadlines?

Compliance with Ontario environmental regulations is strictly monitored. Missing the annual July 1st EWRB submission deadline, failing to execute an annual waste audit under O. Reg. 102/94, or failing to maintain an on-site Waste Reduction Work Plan can result in formal Ministry warnings, compliance orders, and financial penalties applied to the property owner. The amount depends on the offence, so we do not quote a figure here.

I have multiple independent buildings sitting on a single commercial property parcel. Do I file one report?

No. The Ministry of Energy assigns a unique, distinct 6-digit EWRB ID number to each individual eligible building structure based on its structural integrity and square footage. If you manage a campus, shopping complex, or multi-building asset, each qualifying structure must track its consumption metrics and file an independent report.